Adebowale, O J and Agumba, J N (2023) A meta-analysis of factors affecting construction labour productivity in the Middle East. Journal of Construction in Developing Countries, 28(1), 193-220.

Arowoiya, V A and Oyefusi, O N (2023) An analysis of the benefits of adopting modular construction: A Nigerian construction industry context. Journal of Construction in Developing Countries, 28(1), 243-65.

Au-Yong, C P, Ali, A S and Pavaraj, A (2023) Prioritising the maintenance of university hostels to improve students’ satisfaction. Journal of Construction in Developing Countries, 28(1), 151-69.

Buhamizo, I, Muhwezi, L and Sengonzi, R (2023) A regression model to enhance the profitability of local construction contractors in Uganda. Journal of Construction in Developing Countries, 28(1), 221-41.

Chigara, B and Moyo, T (2023) The impact of COVID-19 on the construction sector in Zimbabwe. Journal of Construction in Developing Countries, 28(1), 91-111.

Erlita, A, Amin, M and Bintoro, B P K (2023) Multiphase project risk management on food factory building construction: Consultant perspective. Journal of Construction in Developing Countries, 28(1), 1-17.

  • Type: Journal Article
  • Keywords: optimisation; time overrun; construction project; construction phase; project risk management; risk management; consultant; Indonesia; probability
  • ISBN/ISSN:
  • URL: http://web.usm.my/jcdc/vol28_1_2023/jcdc2023.28.1.1.pdf
  • Abstract:
    This article reports on research on a flour mill factory building construction in Indonesia by investigating the root cause of time overrun in consultant perspective. While numerous risks are identified during the phases of construction project, it is unknown which risk is the primary cause of project delays. To have a better understanding of the optimisation of the risk management and the risk mitigation, a multiphase risk management is proposed, which is divided into four phases, namely pre-design, design, tender and construction. Employing the bow-tie analysis enables a more in-depth examination to identify the risk. From each bow-tie diagram, a detailed risk mitigation table can be formulated and made the response for each risk easier to plan. The probability impact matrix is then used to identify the risk score and to evaluate the risk. This research began by giving questionnaires to 45 qualified respondents. It was found that 45 factors that caused the delay in all phases were divided into nine factors from the pre-design phase, 14 factors from the design phase, 6 factors from the tender phase and 16 factors from the construction phase. As the final step of the risk management process, there are various responses in this research depends on their final assessment based on the scores and the questionnaire results. Factory building construction is quite different from the other type of building construction because machine design also being an important part that affects the structural, architectural, mechanical and electrical aspects.

Kahvandi, Z, Melhado, S and Viana, M L (2023) Solutions to overcome integrated project delivery implementation barriers: A meta-synthesis approach. Journal of Construction in Developing Countries, 28(1), 63-89.

Khamaksorn, A, Nimmolrat, A, Mahat, N and Thinnukool, O (2023) An IDEF0 functional planning model for the development of an asset management framework: A case study of chiang mai university. Journal of Construction in Developing Countries, 28(1), 133-50.

Kikwasi, G J, Sospeter, N G and Rwelamila, P D (2023) Critical success factors for adopting supply chain management in Tanzanian construction projects. Journal of Construction in Developing Countries, 28(1), 43-61.

Mnea, A and Zairul, M (2023) Housing design studies in Saudi Arabia: A thematic review. Journal of Construction in Developing Countries, 28(1), 317-39.

Moyo, T, Mukawa, M, Moyo, C and Chigara, B (2023) Expected competencies of quantity surveyors in Zimbabwe. Journal of Construction in Developing Countries, 28(1), 19-42.

Osman, A M and Liu, Y S (2023) Critical determinants of the competitiveness of the Ghanaian construction industry. Journal of Construction in Developing Countries, 28(1), 267-91.

Parra, H A, Zuñiga-Collazos, A and Cruz-Caicedo, L F (2023) Impact of external risks on international construction projects success: Evidence from commonwealth caribbean islands. Journal of Construction in Developing Countries, 28(1), 113-32.

Powmya, A, Nazirah, Z A and Nurul Sakina, M A (2023) Determination of contractor strategies in delivering construction projects in Oman. Journal of Construction in Developing Countries, 28(1), 293-316.

Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), 171-92.